General information
Bodywork: Hook arm system
Cab: day
Technical information
Number of cylinders: 6
Engine capacity: 12.740 cc
Transmission
Transmission: 12 gears, Automatic
Axle configuration
Front axle 1: Tyre size: 385/65 R22.5; Tyre profile: 40%
Front axle 2: Tyre size: 315/80 R22.5; Differential lock; Tyre profile: 35%; Reduction: single reduction
Rear axle 1: Tyre size: 315/80 R22.5; Differential lock; Tyre profile: 35%; Reduction: single reduction
Rear axle 2: Tyre size: 385/65 R22.5; Tyre profile: 35%
Measures and weights
GVW: 36.000 kg
Max. towing weight: 50.000 kg
Wheelbase: 642 cm
Functional
Crane: palfinger, year of manufacture 2011, behind the cab
Make of bodywork: VDL
Interior
Number of seats: 2
Maintenance
APK (MOT): tested until 05/2026
Additional options and accessories
- Beacon(s)
- Electric mirrors
- Hydraulics
- Rotator
- Sper
- Steering Axle
- Tipping hydraulics
- Work lamp(s)
Remarks
Crane
Highsta: ✓
Number of hydraulic extensions: 2
Number of support legs: 2
Remote control: ✓
Rotator: ✓
Squeeze Box: ✓
| Category | Containertrucks |
| Brand | Scania |
| Model | P 360 B 8X4*4 8x4 Euro 5 met VDL haakarmsysteem en Palfinger Q150Z84TI Radiografische kraan |
| Construction year | 2011 |
| Mileage | 489.496 |
| Weight | 16.440 kg |
| Reference | BS1756 |
| General condition | Good |
| Optical condition | Good |
| Technical condition | Good |
| License plate: | BZ-BD-59 |
| Tireprofile | 36 % |
| Load capacity | 19.660 kg |
| Mileage | 489.496 km |
| Power (ph) | 360 pk |
| Automaton | |
| Air suspension | |
| Fuel: Diesel | |
| Width | 2.550 mm |
| Power (kW) | 265 kW |
| Serial Nr | XLEP8X40005254676 |
| Number of wheels | 8 |
| Lenght | 9.150 mm |
| Initial registration | 02-2011 |
| Number of axes | 4 |
| ABS | |
| Electrically operated windows | |
| Toolbox | |
| Euro | 5 |
| PTO | |
| Radio CD player | |
| Speed limiter | |
| High beams | |
| Disc brakes | |
| AdBlue | |
| Double air | |
| Steering axle | |
| Elevator axle | |
| Axle configuration | 8x4 |
| Crane brand | palfinger |
| Crane year of construction | 01-2011 |